Cisco Systems

Lehi, Utah

PROJECT

30,000-sf tenant buildout in a first-generation space includes reception with floor-toceiling windows; open office environment; café / lounge; and small conference rooms with glass fronts. Unique features include collaboration areas with stadium seating and high-top tables; huddle spaces with bench seating; two “creativity zones” to foster staff interests with music and gaming; staff lockers; and branding walls with automated signage. The project scope also includes custom wood slat ceilings; wall panels; specialty ceiling systems; demountable office fronts; exposed concrete floors; exposed / painted MEP systems; custom acoustic wall panels; and sound masking.

OWNER’S REPRESENTATIVE

JLL

ARCHITECT / ENGINEER

Interior Architects, Inc.
Acuity USA
Stanley Convergent Security

SERVICES

  • Preconstruction
  • General Contracting

SCHEDULE

Phases: 15 weeks
Completion: 6/19