Case Studies

BIM or Bluebeam: Situation Specifics

BIM builds the project virtually to find problems before they happen in the field, and dramatically reduce time lost to conflicts of systems. While BIM is a very powerful and popular software, it requires a significant amount of time to properly coordinate before fabrication and installation.

Learn More »

Educare of West Chicago

During construction of the Educare building, Executive Construction noted condensation in the wall cavity. Educare’s exterior wall was designed for R30 and the wall construction called for 1 ½” of rigid foam insulation, which acted as its own vapor barrier.

Learn More »