Case Studies

CNA Headquarters Relocation

Executed as a joint venture partnership of Turner/Executive Construction, the relocation of the CNA corporate headquarters to a new high-rise building consists of 12 floors. The 300,000-sf buildout at 151 N. Franklin includes an executive suite, conference center floor, technology hubs, and collaboration and amenity support spaces on each workspace floor. The 3rd floor also […]

Learn More »

BIM or Bluebeam: Situation Specifics

BIM builds the project virtually to find problems before they happen in the field, and dramatically reduce time lost to conflicts of systems. While BIM is a very powerful and popular software, it requires a significant amount of time to properly coordinate before fabrication and installation.

Learn More »

Educare of West Chicago

During construction of the Educare building, Executive Construction noted condensation in the wall cavity. Educare’s exterior wall was designed for R30 and the wall construction called for 1 ½” of rigid foam insulation, which acted as its own vapor barrier.

Learn More »